In a pioneering move, the Better Delivery Collective including structural engineering and design experts Design4Structures were directly appointed by Wates Group to carry out the full design and detail of the new complex roof structure for the building behind the iconic ‘Piccadilly Lights’ at One Sherwood Street!
Read the full article here https://www.offsitehub.co.uk/industry-news/news/industry-news/news/design4structures-appointed-by-wates-to-collaborate-on-the-iconic-one-sherwood-street-project/
